14744
|
|
Mandolini, M; Favi, C; Germani, M; Marconi, M Time-based disassembly method: how to assess the best disassembly sequence and time of target components in complex products(2018)International Journal Of Advanced Manufacturing Technology, 95, 1-4 |
7007
|
|
Favi, C; Marconi, M; Germani, M; Mandolini, M A design for disassembly tool oriented to mechatronic product de-manufacturing and recycling(2019) |
10742
|
|
Ehm, F Scheduling and process planning for the dismantling shop with flexible disassembly mode and recovery level(2024) |
7330
|
|
Chand, M; Ravi, C A state-of-the-art literature survey on artificial intelligence techniques for disassembly sequence planning(2023) |
16822
|
|
Cong, L; Zhao, F; Sutherland, JW Value recovery from end-of-use products facilitated by automated dismantling planning(2017)Clean Technologies And Environmental Policy, 19, 7 |
2319
|
|
Vanegas, P; Peeters, JR; Cattrysse, D; Tecchio, P; Ardente, F; Mathieux, F; Dewulf, W; Duflou, JR Ease of disassembly of products to support circular economy strategies(2018) |
12531
|
|
Vyas, P; Rickli, JL Automatic Extraction And Synthesis Of Disassembly Information From Cad Assembly Step File(2016) |
1793
|
|
Cong, L; Zhao, F; Sutherland, JW Integration of dismantling operations into a value recovery plan for circular economy(2017) |
11108
|
|
Ren, YP; Meng, LL; Zhang, CY; Zhao, F; Saif, U; Huang, AH; Mendis, GP; Sutherland, JW An efficient metaheuristics for a sequence-dependent disassembly planning(2020) |
17226
|
|
Mao, J; Hong, D; Chen, Z; Ma, CH; Li, WW; Wang, J Disassembly sequence planning of waste auto parts(2021)Journal Of The Air & Waste Management Association, 71, 5 |