Knowledge Agora



Similar Articles

Title Closed supply network modelling for end-of-life ship remanufacturing
ID_Doc 19149
Authors Chhetri, P; Nikkhah, MJ; Soleimani, H; Shahparvari, S; Shamlou, A
Title Closed supply network modelling for end-of-life ship remanufacturing
Year 2022
Published International Journal Of Logistics Management, 33.0, 2
Abstract Purpose This paper designs an optimal closed-loop supply chain network with an integrated forward and reverse logistics to examine the possibility of remanufacturing end-of-life (EoL) ships. Design/methodology/approach Explanatory variables are used to estimate the number of EoL ships available in a closed-loop supply chain network. The estimated number of EoL ships is used as an input in the model and then it is solved by a mixed-integer linear programming (MILP) model of the closed-loop supply chain network to minimise the total logistic costs. A discounted payback period formula is developed to calculate the length of time to recoup an investment based on the investment's discounted cash flows. Existing ship wrecking industry clusters in the Western region of India are used as the case study to apply the proposed model. Findings The MILP model has optimised the total logistics costs of the closed-loop supply network and ascertained the optimal number and location of remanufacturing for building EoL ships. The capital and variable costs required for establishing and operating remanufacturing centres are computed. To remanufacture 30 ships a year, the discounted payback period of this project is estimated to be less than two years. Practical implications Ship manufacturing businesses are yet to re-manufacture EoL ships, given high upfront capital expenditure and operational challenges. This study provides management insights into the costs and benefits of EoL ship remanufacturing; thus, informing the decision-makers to make strategic operational decisions. Originality/value The design of an optimal close loop supply chain network coupled with a Bayesian network approach and discounted payback period formula for the collection and remanufacturing of EoL ships provides a new integrated perspective to ship manufacturing.
PDF

Similar Articles

ID Score Article
26382 Karunakaran, SK; Ramasamy, N; Anand, MD; Santhi, N Factor analysis of environmental effects in circular closed-loop supply chain network design and modelling under uncertainty in the manufacturing industry(2024)Environmental Quality Management, 34, 1
22915 Bagalagel, S; ElMaraghy, W Hybrid decision-making and optimisation framework for manufacturing-remanufacturing closed loop systems(2021)International Journal Of Sustainable Engineering, 14.0, 6
16209 Gharibi, K; Abdollahzadeh, S A mixed-integer linear programming approach for circular economy-led closed-loop supply chains in green reverse logistics network design under uncertainty(2021)
21083 Zhou, Y; Liu, XQ; Wong, KH Remanufacturing Policies Options for a Closed-Loop Supply Chain Network(2021)Sustainability, 13.0, 12
9117 Accorsi, R; Manzini, R; Pini, C; Penazzi, S On the design of closed-loop networks for product life cycle management: Economic, environmental and geography considerations(2015)
15082 Ropi, NM; Hishamuddin, H; Wahab, DA; Jauhari, WA; Rashid, FAA; Khamis, NK; Mohamed, IF; Sabri, MAM; Abu Mansor, MR Optimal Lot-Sizing Decisions for a Remanufacturing Production System under Spare Parts Supply Disruption(2023)Mathematics, 11, 19
76692 Al-Refaie, A; Jarrar, Y; Lepkova, N Sustainable Design of a Multi-Echelon Closed Loop Supply Chain under Uncertainty for Durable Products(2021)Sustainability, 13, 19
Scroll