Knowledge Agora



Similar Articles

Title An investigation into challenges and opportunities in the Australian construction and demolition waste management system
ID_Doc 22546
Authors Shooshtarian, S; Caldera, S; Maqsood, T; Ryley, T; Khalfan, M
Title An investigation into challenges and opportunities in the Australian construction and demolition waste management system
Year 2022
Published Engineering Construction And Architectural Management, 29.0, 10
Abstract Purpose The literature shows that the current Australian waste management framework does not meet industry and government expectations. This study, therefore, seeks the key construction and demolition (C&D) stakeholders' insights on various issues identified. It aims to understand the main barriers to effective C&D waste management, examining the role of the federal government and exploring perceptions around waste regulations, policies and schemes. Design/methodology/approach An online survey was conducted in 2019 to capture stakeholder perceptions. One hundred and thirty-two participants from various industries and government agencies representing Australian jurisdictions took part in the survey. Quantitative and qualitative data were collected. Findings The results show that the main barriers are "overregulation, tough acceptance criteria and increased testing requirements", "lack of local market" and "culture, poor education and low acceptance". The main areas of improvement include "providing a guideline that determines the accepted level of contamination for reusing C&D waste", "preparation of guidelines on requirements of using recycled C&D materials in different industries" and "setting a target for reduction, reusing and recycling C&D waste". Research limitations/implications Some research findings may not be generalisable beyond Australia, but there are interesting insights for an international audience. The results inform policy development within the Australian states and territories context, to support the design and implementation of a circular economy model in the construction industry. The findings are evidence for a broader discussion to solve prevailing issues in C&D waste management, notably in the context of construction materials' end of life management. Practical implications The study highlights that policy development needs to be further expanded to include new/current waste management schemes including manufacturer's shared responsibility of waste generation, subsidies for C&D waste recycled materials and the proximity principle. Originality/value This paper provides a clear insight into C&D waste management stakeholders' perceptions towards the current waste management system in Australia.
PDF

Similar Articles

ID Score Article
4849 Shooshtarian, S; Maqsood, T; Caldera, S; Ryley, T Transformation towards a circular economy in the Australian construction and demolition waste management system(2022)
27500 Ratnasabapathy, S; Alashwal, A; Perera, S Exploring the barriers for implementing waste trading practices in the construction industry in Australia(2021)Built Environment Project And Asset Management, 11.0, 4
22581 Shooshtarian, S; Caldera, S; Maqsood, T; Ryley, T; Wong, PSP; Zaman, A Analysis of factors influencing the creation and stimulation of the Australian market for recycled construction and demolition waste products(2022)
15504 Ratnasabapathy, S; Alashwal, A; Perera, S Investigation of waste diversion rates in the construction and demolition sector in Australia(2021)Built Environment Project And Asset Management, 11, 3
26131 Jahan, I; Zhang, GM; Bhuiyan, M; Navaratnam, S; Shi, L Experts' Perceptions of the Management and Minimisation of Waste in the Australian Construction Industry(2022)Sustainability, 14, 18
22951 Shooshtarian, S; Caldera, S; Maqsood, T; Ryley, T Using Recycled Construction and Demolition Waste Products: A Review of Stakeholders' Perceptions, Decisions, and Motivations(2020)Recycling, 5.0, 4
28884 She, YC; Udawatta, N; Liu, CL; Tokede, O Circular Economy-Related Strategies to Minimise Construction and Demolition Waste Generation in Australian Construction Projects(2024)Buildings, 14.0, 8
10081 Wu, HY; Zuo, J; Yuan, HP; Zillante, G; Wang, JY Cross-regional mobility of construction and demolition waste in Australia: An exploratory study(2020)
3297 Lim, BTH; Oo, BL; McLeod, C; Yang, PQ Institutional and Actor Network Perspectives of Waste Management in Australia: Is the Construction Industry Prepared for a Circular Economy?(2024)Sustainability, 16, 2
23169 Shooshtarian, S; Maqsood, T; Wong, PSP; Khalfan, M; Yang, RBJ Extended Producer Responsibility in the Australian Construction Industry(2021)Sustainability, 13, 2
Scroll