Knowledge Agora



Similar Articles

Title Remanufacturing challenges and possible lean improvements
ID_Doc 23572
Authors Kurilova-Palisaitiene, J; Sundin, E; Poksinska, B
Title Remanufacturing challenges and possible lean improvements
Year 2018
Published
Abstract Remanufacturing is a viable way to prolong the useful life of an end-of-use product or its parts. Despite its economic, environmental, and social benefits, remanufacturing is associated with many challenges related to core (used product or its part) availability, timing and quality. The aim of this paper is to study how lean production could be used to tackle remanufacturing process challenges and contribute to shorter lead times. To meet this aim, we conducted a literature review and case studies of four remanufacturing companies. The case companies' remanufacturing challenges were: (1) a lack of material requirements planning system, (2) poor core information, (3) a lack of core material, (4) poor spare parts information, (5) a lack of spare parts material, (6) insufficient quality management practices, (7) large inventories, (8) stochastic remanufacturing processes, (9) a lack of supply-demand balance, and (10) insufficient automation. These challenges contribute to long and variable remanufacturing process lead times. To tackle remanufacturing challenges, seven lean-based improvements with a major effect on improvements in lead time were suggested: standard operations, continuous flow, Kanban, teamwork, employee cross-training, layout for continuous flow, and supplier partnership. Providing that the suggested improvements are implemented, a possible lead time reduction of 83-99 per cent was projected. (C) 2017 Elsevier Ltd. All rights reserved.
PDF

Similar Articles

ID Score Article
23576 Pawlik, E; Ijomah, W; Corney, J; Powell, D Exploring the Application of Lean Best Practices in Remanufacturing: Empirical Insights into the Benefits and Barriers(2022)Sustainability, 14, 1
9971 Sitcharangsie, S; Ijomah, W; Wong, TC Decision makings in key remanufacturing activities to optimise remanufacturing outcomes: A review(2019)
5225 Duberg, JV; Johansson, G; Sundin, E; Kurilova-Palisaitiene, J Prerequisite factors for original equipment manufacturer remanufacturing(2020)
23081 Paul, M; Eickholt, D; Reinhart, G Framework for adaptable remanufacturing(2024)Production And Manufacturing Research-An Open Access Journal, 12, 1
20532 Fofou, RF; Jiang, ZG; Wang, Y A Review on the Lifecycle Strategies Enhancing Remanufacturing(2021)Applied Sciences-Basel, 11, 13
17165 Leberruyer, N; Agerskans, N; Elvin, M; Chirumalla, K Remanufacturing Components Using Twin Transition - An Exploratory Study in the Heavy-Duty Vehicle Industry(2024)
23805 Gorroño-Albizu, L; Soto-Gordoa, M; Justel, D; Eguren, JA Guiding Questions for the Efficient Management of Logistics and Manufacturing Operations in Remanufacturing Systems(2024)
9382 Mustajib, MI; Ciptomulyono, U; Kurniati, N A Model for Remanufacturing Process Planning Under Quality Loss and Emissions Constraint with Multi-graded of Incoming Cores(2024)
21067 Diener, DL; Kushnir, D; Tillman, AM Scrap happens: A case of industrial end-users, component remanufacturing outcome(2019)
74309 Goodall, P; Rosamond, E; Harding, J A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility(2014)
Scroll