21089
|
|
Eftekhari, AF; Khodabakhshian, A; Iuorio, O; Cecconi, FR; Daniotti, B A New Building Information Modelling-Based Approach to Automate Recyclability Rate Calculations for Buildings(2024)Buildings, 14.0, 6 |
24794
|
|
Quiñones, R; Llatas, C; Montes, MV; Cortés, I A Multiplatform BIM-Integrated Construction Waste Quantification Model during Design Phase. The Case of the Structural System in a Spanish Building(2021)Recycling, 6, 3 |
18885
|
|
Llatas, C; Quiñones, R; Bizcocho, N Environmental Impact Assessment of Construction Waste Recycling versus Disposal Scenarios Using an LCA-BIM Tool during the Design Stage(2022)Recycling, 7.0, 6 |
8758
|
|
Jayasinghe, LB; Waldmann, D Development of a BIM-Based Web Tool as a Material and Component Bank for a Sustainable Construction Industry(2020)Sustainability, 12.0, 5 |
6678
|
|
Wang, SQ; Wu, QQ; Yu, JP BIM-Based Assessment of the Environmental Effects of Various End-of-Life Scenarios for Buildings(2024)Sustainability, 16, 7 |
19473
|
|
Akbarieh, A; Jayasinghe, LB; Waldmann, D; Teferle, FN BIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review(2020)Sustainability, 12.0, 7 |
27453
|
|
Byers, BS; Raghu, D; Olumo, A; De Wolf, C; Haas, C From research to practice: A review on technologies for addressing the information gap for building material reuse in circular construction(2024) |
18665
|
|
Guerra, BC; Leite, F; Faust, KM 4D-BIM to enhance construction waste reuse and recycle planning: Case studies on concrete and drywall waste streams(2020) |
6770
|
|
Honic, M; Kovacic, I; Aschenbrenner, P; Ragossnig, A Material Passports for the end-of-life stage of buildings: Challenges and potentials(2021) |
20383
|
|
Mollaei, A; Bachmann, C; Haas, C ?Estimating the recoverable value of in-situ building materials?(2023) |