Knowledge Agora



Similar Articles

Title A study on the waste generation rates and recycling potential for the construction and demolition waste in Dhaka, Bangladesh
ID_Doc 26638
Authors Haque, SE; Nahar, N; Haque, MS
Title A study on the waste generation rates and recycling potential for the construction and demolition waste in Dhaka, Bangladesh
Year 2024
Published Environmental Monitoring And Assessment, 196, 2
Abstract Construction and demolition waste has a high environmental and socio-economic impact due to its poor management infrastructure. In recent years, Dhaka, the capital city of Bangladesh, experienced significant growth in the real estate sector, which demands substantial construction and demolition activities within the city. Most of the construction and demolition waste finds its way to landfills, roadsides, and unapproved locations with a 2% recycling rate through local scrap vendors and unregulated recyclers. In an effort to assess the waste generation rates from ongoing construction and demolition activities, the current study employed the Site Visit method along with direct and indirect waste quantification methodologies for the investigated demolition and construction projects, respectively. The findings indicate that for per unit area (m2) of demolition and construction, the average WGR was found to be approximately 575.0 kg and 73.9 kg, respectively. Projection reveals that by 2025 and 2030, within Dhaka City, construction and demolition activities will generate roughly 1.15 MT and 1.69 MT of construction and demolition waste if no recycling actions are considered. Additionally, the results highlight the recycling potential of construction and demolition waste with respect to economic benefits through the maximum recycling rates for the relevant materials. Furthermore, to address the future of sustainable construction and demolition waste management infrastructure, this paper presents a detailed overview of the current onsite construction and demolition waste management practices as well as safety protocols for demolition and construction activities.
PDF

Similar Articles

ID Score Article
19845 Kabirifar, K; Mojtahedi, M; Wang, CX; Tam, VWY Construction and demolition waste management contributing factors coupled with reduce, reuse, and recycle strategies for effective waste management: A review(2020)
26654 Patel, VG; Patel, DJ; Patel, DA; Jha, KN A Science Mapping Approach Based Review of Construction and Demolition Waste Management(2020)
66379 Hoang, NH; Ishigaki, T; Kubota, R; Tong, TK; Nguyen, TT; Nguyen, HG; Yamada, M; Kawamoto, K Waste generation, composition, and handling in building-related construction and demolition in Hanoi, Vietnam(2020)
16666 HaitherAli, H; Anjali, G Sustainable urban development: Evaluating the potential of mineral-based construction and demolition waste recycling in emerging economies(2024)
4972 Sharma, N; Kalbar, PP; Salman, M Global review of circular economy and life cycle thinking in building Demolition Waste Management: A way ahead for India(2022)
7073 Soyinka, OA; Wadu, MJ; Hewage, UWAL; Oladinrin, TO Scientometric review of construction demolition waste management: a global sustainability perspective(2023)Environment Development And Sustainability, 25, 10
7685 Xu, YH; He, G Analysis of Key Influencing Factors of Construction Waste Treatment Based on Statistical Model(2017)
15504 Ratnasabapathy, S; Alashwal, A; Perera, S Investigation of waste diversion rates in the construction and demolition sector in Australia(2021)Built Environment Project And Asset Management, 11, 3
6480 Soultanidis, V; Voudrias, EA Modelling of demolition waste generation: Application to Greek residential buildings(2023)Waste Management & Research, 41, 9
6320 Boateng, SB; Banawi, AA; Asa, E; Yu, Y; Ahiable, C Environmental and economic outlook of construction and demolition waste management practices in a mid-sized city(2023)Journal Of Material Cycles And Waste Management, 25, 4
Scroll