Abstract |
Aiming at the problem of all kinds of green road technology is difficult to compare with, energy conservation and emissions reduction from the technical feasibility and economic benefits, etc. Build green road technologies LCA evaluation system is put forward, and with G312 Suzhou western engineering comprehensive benefit analysis as an example, the comprehensive benefit of the most significant, have scale, resource investment suitable green road technologies; the breakthrough and innovation of technical bottleneck problem is the fundamental power to promote the development of green highway. The premise of integrating green concept into the whole life cycle of highway construction is not only the preliminary planning layout research according to local conditions, but also the basis of reasonable selection of suitable green highway technology. |