14744
|
|
Mandolini, M; Favi, C; Germani, M; Marconi, M Time-based disassembly method: how to assess the best disassembly sequence and time of target components in complex products(2018)International Journal Of Advanced Manufacturing Technology, 95, 1-4 |
2319
|
|
Vanegas, P; Peeters, JR; Cattrysse, D; Tecchio, P; Ardente, F; Mathieux, F; Dewulf, W; Duflou, JR Ease of disassembly of products to support circular economy strategies(2018) |
16320
|
|
Sergio, M; Franciosi, C; Iannone, R A model for the economic assessment of disassembly-line integration in traditional manufacturing processes(2021) |
2402
|
|
Sassanelli, C; Rosa, P; Terzi, S Circular Economy-oriented Simulation: A Literature Review Grounded on Empirical Cases(2020) |
10066
|
|
Marconi, M; Germani, M; Mandolini, M; Favi, C Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products(2019)International Journal Of Production Research, 57.0, 2 |
3415
|
|
Witharanage, SDH; Holtta-Otto, K; Otto, K; Li, W Designing Complex Systems For Decommissioning In A Circular Economy: A Systematic Literature Review(2023) |