Title | Strengthening of the bridge-device SB30-development of the strengthening concepts (part1) |
---|---|
ID_Doc | 63348 |
Authors | Klaehne, T; Schöne, J; Schreiber, O; Gautier, F; Stihl, T; Heiland, U |
Title | Strengthening of the bridge-device SB30-development of the strengthening concepts (part1) |
Year | 2024 |
Published | |
Abstract | Strengthening of the bridge-device SB30 - development of the strengthening concepts (part 1) The Federal Ministry of Digital and Transport (BDMV) and SYSTEC GmbH have around 7500 t of the SB30 system-bridge for use in disaster-protection and for temporary measures in the repair of the transport-infrastructure. However, the bridge-device developed in the GDR in the 1970s no longer meets today's requirements and can therefore only be used to a very limited extent. In order to avoid resource-intensive replacement of these inventories, SYSTEC GmbH, together with SEH Engineering GmbH and the engineers of KL & Auml;HNE BUNG, is developing various strengthening-concepts that enable the continued use of the outdated SB30 bridge-device in the spirit of the Green Deal announced by the European Commission. |
No similar articles found.