Knowledge Agora



Similar Articles

Title Decision making guidelines for mining historic landfill sites in Flanders
ID_Doc 7247
Authors Winterstetter, A; Wille, E; Nagels, P; Fellner, J
Title Decision making guidelines for mining historic landfill sites in Flanders
Year 2018
Published
Abstract This study aims at showing how the United Nations Framework Classification for Resources (UNFC) can help to classify potential landfill mining projects with different levels of maturity, from exploration to production, under technical, socio-economic and project-planning aspects. Taking the example of three former landfill sites in Flanders general decision making guidelines regarding the future management of old landfills are provided. Using the ECLAR methodology for the evaluation (E) and classification (CL) of anthropogenic resources (AR), the individual projects, where clean land and/or materials are recovered, are mapped under the three-dimensional UNFC system. The Bornem project, yields a negative Net Present Value (NPV) of 17 Mio (sic) (-44 (sic)/t of excavated waste), i.e. the project is currently not economically viable. In case of changing key parameters the landfill has, however, reasonable prospects for future economic extraction. The Turnhout land development turned out to be economically viable with a NPV of 361,000 (sic) (8 (sic)/t of excavated waste). The Zuienkerke remediation project is at a too early stage to determine its socioeconomic viability. The main focus to compare and prioritize potential landfill mining projects in Flanders should be on (1) site specific conditions (e.g. landfill's composition, land prices), (2) project related factors (e.g. remediation required vs. resource/land recovery, selected technologies and project set-ups, private vs. public evaluation perspective) and (3) the timing of mining, considering future development of costs, prices, laws, available data and information. (C) 2018 Elsevier Ltd. All rights reserved.
PDF

Similar Articles

ID Score Article
10307 Jones, PT; Geysen, D; Tielemans, Y; Van Passel, S; Pontikes, Y; Blanpain, B; Quaghebeur, M; Hoekstra, N Enhanced Landfill Mining in view of multiple resource recovery: a critical review(2013)
13664 Brand, E; de Nijs, TCM; Dijkstra, JJ; Comans, RNJ A novel approach in calculating site-specific aftercare completion criteria for landfills in The Netherlands: Policy developments(2016)
13206 Wille, E; Isenborghs, C; Lamair, L; Neculau, C; De Rijdt, R Cedalion And Orion: A Two-Step Decision Support Tool To Allow Smart Elfm Project Planning, Prioritisation And Sustainable Interim Use (Rawfill Project)(2022)
25286 Einhäupl, P; Krook, J; Svensson, N; Van Acker, K; Van Passel, S Eliciting stakeholder needs - An anticipatory approach assessing enhanced landfill mining(2019)
23327 Scharff, H Landfill reduction experience in The Netherlands(2014)Waste Management, 34, 11
26342 Einhäupl, P; Van Acker, K; Peremans, H; Van Passel, S The conceptualization of societal impacts of landfill mining e A system dynamics approach(2021)
11025 Di Maria, A; Eyckmans, J; Van Acker, K Downcycling versus recycling of construction and demolition waste: Combining LCA and LCC to support sustainable policy making(2018)
16754 Hogland, M; Arina, D; Kriipsalu, M; Jani, Y; Kaczala, F; Salomao, ALD; Orupold, K; Pehme, KM; Rudovica, V; Denafas, G; Burlakovs, J; Vincevica-Gaile, Z; Hogland, W Remarks on four novel landfill mining case studies in Estonia and Sweden(2018)Journal Of Material Cycles And Waste Management, 20, 2
24603 Johansson, O; Pettersson, M Environmental Law Issues In Connection With Landfill Mining(2022)
29813 Aracil, C; Haro, P; Gómez-Barea, A The Role Of Advanced Waste-To-Energy Technologies In Landfill Mining(2017)
Scroll