11108
|
|
Ren, YP; Meng, LL; Zhang, CY; Zhao, F; Saif, U; Huang, AH; Mendis, GP; Sutherland, JW An efficient metaheuristics for a sequence-dependent disassembly planning(2020) |
10742
|
|
Ehm, F Scheduling and process planning for the dismantling shop with flexible disassembly mode and recovery level(2024) |
9599
|
|
Lu, Q; Ren, YP; Jin, HY; Meng, LL; Li, L; Zhang, CY; Sutherland, JW A hybrid metaheuristic algorithm for a profit-oriented and energy-efficient disassembly sequencing problem(2020) |
13560
|
|
Gao, YC; Lou, SH; Zheng, H; Tan, JR A data-driven method of selective disassembly planning at end-of-life under uncertainty(2023)Journal Of Intelligent Manufacturing, 34, 2 |
30028
|
|
Shabanpour, N; Colledani, M Integrated workstation design and buffer allocation in disassembly systems for remanufacturing(2018) |
17226
|
|
Mao, J; Hong, D; Chen, Z; Ma, CH; Li, WW; Wang, J Disassembly sequence planning of waste auto parts(2021)Journal Of The Air & Waste Management Association, 71, 5 |
14744
|
|
Mandolini, M; Favi, C; Germani, M; Marconi, M Time-based disassembly method: how to assess the best disassembly sequence and time of target components in complex products(2018)International Journal Of Advanced Manufacturing Technology, 95, 1-4 |