Knowledge Agora



Similar Articles

Title Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain
ID_Doc 7590
Authors Jiménez-Rivero, A; de Guzmán-Báez, A; García-Navarro, J
Title Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain
Year 2017
Published Sustainability, 9, 3
Abstract On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB), on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I); PB installation (II); Construction waste storage at the installation area (III); PB waste segregation at the installation area (IV) and PB waste transfer to the PB container and storage (V). The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: 'Training and commitment' and 'fulfilling the requirements established by the current regulation'. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.
PDF

Similar Articles

ID Score Article
27778 Luciano, A; Cutaia, L; Altamura, P; Penalvo, E Critical issues hindering a widespread construction and demolition waste (CDW) recycling practice in EU countries and actions to undertake: The stakeholder?s perspective(2022)
18989 Abarca-Guerrero, L; Lobo-Ugalde, S; Méndez-Carpio, N; Rodríguez-Leandro, R; Rudin-Vega, V Zero Waste Systems: Barriers and Measures to Recycling of Construction and Demolition Waste(2022)Sustainability, 14.0, 22
22221 Gálvez-Martos, JL; Styles, D; Schoenberger, H; Zeschmar-Lahl, B Construction and demolition waste best management practice in Europe(2018)
23422 Ramos, M; Martinho, G; Pina, J Strategies to promote construction and demolition waste management in the context of local dynamics(2023)
26131 Jahan, I; Zhang, GM; Bhuiyan, M; Navaratnam, S; Shi, L Experts' Perceptions of the Management and Minimisation of Waste in the Australian Construction Industry(2022)Sustainability, 14, 18
18015 Bao, ZK; Lu, WS A decision-support framework for planning construction waste recycling: A case study of Shenzhen, China(2021)
18796 Ogunmakinde, O; Sher, W; Maund, K An Assessment of Material Waste Disposal Methods in the Nigerian Construction Industry(2019)Recycling, 4.0, 1
16246 Jiménez-Rivero, A; García-Navarro, J; de Guzmán-Báez, A; Rodríguez-Quijano, M End-Of-Life Of Gypsum Plasterboard: European Case Studies Analysis(2015)
27500 Ratnasabapathy, S; Alashwal, A; Perera, S Exploring the barriers for implementing waste trading practices in the construction industry in Australia(2021)Built Environment Project And Asset Management, 11.0, 4
29735 Drochytka, R; Dufek, Z; Michalcíková, M; Hodul, J Study of Possibilities of Using Special Types of Building and Demolition Waste in Civil Engineering(2020)Periodica Polytechnica-Civil Engineering, 64.0, 1
Scroll