14744
|
|
Mandolini, M; Favi, C; Germani, M; Marconi, M Time-based disassembly method: how to assess the best disassembly sequence and time of target components in complex products(2018)International Journal Of Advanced Manufacturing Technology, 95, 1-4 |
29884
|
|
Belhadj, I; Khemili, I; Trigui, M; Aifaoui, N Time computing technique for wear parts dismantling(2019)International Journal Of Advanced Manufacturing Technology, 103.0, 9-12 |
10066
|
|
Marconi, M; Germani, M; Mandolini, M; Favi, C Applying data mining technique to disassembly sequence planning: a method to assess effective disassembly time of industrial products(2019)International Journal Of Production Research, 57.0, 2 |
7007
|
|
Favi, C; Marconi, M; Germani, M; Mandolini, M A design for disassembly tool oriented to mechatronic product de-manufacturing and recycling(2019) |
12531
|
|
Vyas, P; Rickli, JL Automatic Extraction And Synthesis Of Disassembly Information From Cad Assembly Step File(2016) |
13560
|
|
Gao, YC; Lou, SH; Zheng, H; Tan, JR A data-driven method of selective disassembly planning at end-of-life under uncertainty(2023)Journal Of Intelligent Manufacturing, 34, 2 |
25408
|
|
Rodríguez, NB; Favi, C Disassembly and Repairability of Mechatronic Products: Insight for Engineering Design(2024)Journal Of Mechanical Design, 146, 2 |