Knowledge Agora



Scientific Article details

Title Stabilization works in the quarry of Punta Lucero (Port of Bilbao)
ID_Doc 26517
Authors Escobal, I; Baraibar, JM; Mochales, JLG; González, J; Arlandi, M; Bernardo, A
Title Stabilization works in the quarry of Punta Lucero (Port of Bilbao)
Year 2021
Published Informes De La Construccion, 73, 562
DOI 10.3989/ic.79345
Abstract This article describes the works of slope stabilization in the ancient quarry of Punta Lucero, in the facilities of the Port Authority of Bilbao. This technical intervention was necessary to prevent rockfalls, threatening some strategic fuel storage facilities in the port platform. The works have been designed considering that the material obtained from the works has to be employed as fill material for another contractual arrangement in the area, the construction of a Central Breakwater in the extension of the Port of Bilbao. Besides, the technique of descending benching has been employed, together with a double shaft-tunnel system. This method has many advantages, both from the perspective of safety and from an environmental point of view, as it reduces the emission of greenhouse gases. This system has no precedents in slope stabilization works.
Author Keywords stabilization; descending benching; tunnel; raise-boring; shaft-tunnel; blasting; circular economy; ecodesign
Index Keywords Index Keywords
Document Type Other
Open Access Open Access
Source Science Citation Index Expanded (SCI-EXPANDED)
EID WOS:000692130400012
WoS Category Construction & Building Technology; Engineering, Civil
Research Area Construction & Building Technology; Engineering
PDF
Similar atricles
Scroll